Object ID: 1151
Sale
~101,263,450 ₸ / ~19,491,600 ₽
from 185,000 €
Rooms:
1+1, 2+1, 3+1
Terms of Sale:
Sell Only
City:
Alanya
District:
Jikgilli
Type of the Object:
From a developer
Square:
45 - 138 м2
Residence Permit:
Yes
Citizenship:
Yes
Location: Cikdilli, Alanya Construction start date - 01.2023 Date completion of construction - 04.2024 Distance to Alanya Hospital 2.8 km Distance to the center of Alanya 3.3 km Distance to the sea 1.8 km Distance from the airport 40 km • Granite flooring 60*120 • Glossy kitchen cabinets • Black Star granite countertops Galaxy Color • Double glazed and insulated window frames • Steel door. • Shower cabin made of tempered glass CLOSED SOCIAL ZONES - Playground - Fitness - Jacuzzi - Sauna - Restroom - Lobby OPEN SOCIAL ZONES -Pool -Open children's playroom area -Recreation areas - BBQ area -Open parking SOCIAL ZONES (CLOSED): -Jacuzzi -Gym -Sauna -Shower -Restroom -Playground
Supermarket
Restaurant
Playground
Sports Playground
Outdoor Swimming Pool for children
Indoor swimming pool
SPA
1 km to the sea
Fitness Gym
Concierge
Urban infrastructure, which is located within 1-1.5 km of this property. It includes the following urban buildings:
3+ Pharmacies
Residence Permit
Leave a request for visiting an object. Our manager will contact you shortly and specify the details of the appointment
Name*
Phone*
Similar objects you'd like
Restaurant
Playground
Outdoor Swimming Pool
Total area – 2800 m2 Apartments 2+1. 90m2 gross, 67m2 net General characteristics: Central heating system Heat-resistant BIMS blocks are used Intelligent elevator system Fire detector inside the building Full generator Interior features: Suspended ceiling Kitchen cabinets Wardrobe Bathroom cabinets Kitchen countertops Steel entrance door PVC windows Imported silicone-based paint Plumbing of the 1st class Laminate 10 mm Glass balcony partitions Features of the social sphere: Outdoor swimming pool Outdoor parking Children's playground Barbecue and relaxation area Construction start date – April 2022 Completion date – July 2023
Total area – 6400 m2 General characteristics: Heat-resistant BIMS blocks are used Intelligent elevator system Fire detector inside the building Full generator Interior features: Suspended ceiling Kitchen cabinets Wardrobe Bathroom cabinets Kitchen countertops Steel entrance door PVC windows Imported silicone-based paint Plumbing of the 1st class Laminate 10 mm Glass balcony partitions Features of the social sphere: Outdoor swimming pool Outdoor parking Children's playground Barbecue and relaxation area Construction start date – April 2021 Completion date – June 2023
Playground
Sports Playground
Outdoor Swimming Pool for children
Start of construction – June 2021 Completion of construction – June 2023 General characteristics: apartments 3+1 - 120m2 apartments 2+1 - 100m2 1500m2 – green area, 300m2 – swimming pool, 800m2 – covered parking General characteristics: Central heating system Heat-resistant BIMS blocks are used Intelligent elevator system Fire detector inside the building Full generator Interior features: Suspended ceiling Kitchen cabinets Wardrobe Bathroom cabinets Kitchen countertops Steel entrance door PVC windows Imported silicone-based paint Plumbing of the 1st class Laminate 10 mm Glass balcony partitions Features of the social sphere: Outdoor swimming pool Outdoor parking Closed parking Sauna Hamam Sports grounds Children's playground Barbecue and relaxation area
Supermarket
Restaurant
Playground
General characteristics: Heat-resistant BIMS blocks are used Intelligent elevator system Fire detector inside the building Full generator Gas heating system Interior features: Suspended ceiling Kitchen cabinets Wardrobe Bathroom cabinets Kitchen countertops Steel entrance door PVC windows Imported silicone-based paint Plumbing of the 1st class Laminate 10 mm Glass balcony partitions Features of the social sphere: Outdoor swimming pool Outdoor parking Children's playground Barbecue and recreation area 2350m2 total area 1 block, 91 apartments Apartments 2+1 and 3+1 650 meters to the sea Start of construction - 01.08.2022 Completion of construction - 30.08.2023